Description:

  • Brownfield site within flood zone 1
  • Detailed consultation with Environment Agency and United Utilities to agree surface and foul water drainage strategy
  • Detailed design drawings for inclusion within the relevant agreements: sections 104, 38 and 185
  • External works and private drainage designs
  • Cut and fill isopachyte drawing, including volumes
  • Road, drainage and plot setting out drawings