Description:
- Brownfield site within flood zone 1
- Detailed consultation with Environment Agency and United Utilities to agree surface and foul water drainage strategy
- Detailed design drawings for inclusion within the relevant agreements: sections 104, 38 and 185
- External works and private drainage designs
- Cut and fill isopachyte drawing, including volumes
- Road, drainage and plot setting out drawings
